Call For Paper November 2026

Search Mode
Sort Results
Filter By Journal

Featured Publications

IJCE IJCE-V13I10P117

For the computation of the bed load transport rate at a particular section of stream, the selection of any approach depe...

Tanmay Kumar, Mohd Zia Hussain, Mukesh Kumar, Abhay Kumar, Dhananjay Kumar
IJCE IJCE-V13I10P116

Traditional rural Tamil Nadu houses include courtyard architecture, norisha, shaded over gangs spaces, openings, and loc...

K. Chithra, M. Bhuvaneshwari, C.V. Subramanian
IJCE IJCE-V13I10P115

Distillery Spent Wash (DSW) is a highly contaminated wastewater that is difficult to treat because it contains dissolved...

Pooja P, Lokeshappa B, Rashma Shetty, Anil Kumar B.S
IJCE IJCE-V13I10P114

This research paper presents the conceptual design, development and performance evaluation of a compact fugitive vehicul...

Dipak G. Mangrulkar, Prashant Y. Pawade, Mangesh P. Bhorkar
IJCE IJCE-V13I10P113

Driven by the imbalance between nutrient discharge and availability of natural resources, there is a growing need for su...

Urmila R. Kawade, Shreyas B V, Puneeth M S, Padmesh Tirunelveli Narayanapillai, Snehal K.Kamble, Shubham Kumar Verma, Prashant Sunagar
IJCE IJCE-V13I10P112

Metro rail transit systems (i.e., urban and light rail) have impacts on the mitigation of congestion and sustainable dev...

Toral Vyas, H. R. Varia, Sandip C. Rathod, Haresh Golakiya, Bhoraniya Tushar H, Jalpa Modi
IJCE IJCE-V13I10P111

Architectural signage in educational hospital environments is often thought of in terms of identification, information a...

Andi Siti Junisa Faradikah, Triyatni Martosenjoyo, Syahriana Syam
IJCE IJCE-V13I10P110

Cultural practices thrive in urban environments due to the sensory aspects of daily experiences and ordinary urban life....

Shrigowri Mangalvedhe, Jotirmay Chari
IJCE IJCE-V13I10P109

Sedimentation in the Lake Tondano watershed was assessed by comparing estimates from the Universal Soil Loss Equation (U...

Liany Amelia Hendratta, Arthur Harris Thambas, Isri Ronald Mangangka, La’la Monica
IJCE IJCE-V13I10P108

The prediction of the duration of a construction project is a highly complex task influenced by multiple factors. To tac...

Hicham Hassi, Mouna El Mkhalet, Nouzha Lamdouar