Feeder Board Design with GCHK-100 Protection Relay with Ground Wire Verification, Ground Fault Protection and Frame Voltage for Protection of Human Personnel

International Journal of Electrical and Electronics Engineering
© 2023 by SSRG - IJEEE Journal
Volume 10 Issue 10
Year of Publication : 2023
Authors : Jorge Luis Osorio-Alonzo, Victor Romero-Alva
pdf
How to Cite?

Jorge Luis Osorio-Alonzo, Victor Romero-Alva, "Feeder Board Design with GCHK-100 Protection Relay with Ground Wire Verification, Ground Fault Protection and Frame Voltage for Protection of Human Personnel," SSRG International Journal of Electrical and Electronics Engineering, vol. 10,  no. 10, pp. 98-107, 2023. Crossref, https://doi.org/10.14445/23488379/IJEEE-V10I10P111

Abstract:

Nowadays, in the formal mining industry, there are failures due to ground or casing discharges when mobile drilling equipment is used, which causes damages to the operating personnel of this equipment. This work proposes a solution by designing a power supply board with a relay that senses the casing voltage of the ground fault current. It verifies the ground wire, which circulates in the power supply of the drilling rigs. At the end of the design, laboratory tests were made to the relay, where the response times of the relay were verified; being in the ground fault injected a current of 0.25Amp and giving a time of 17.20mS of response, the voltage in the casing triggered instantaneously in 38V, and the resistance of the cable beginning instantaneously with a resistance of 20ohms.

Keywords:

Protection relay, GCHK-100, Feeder board, Human protection, Grounding wire.

References:

[1] Alejandro Toledo, Pedro Pablo Kuczynski Godard, and Glodomiro Sánchez Mejía, La presente Resolución Suprema será refrendada por el Presidente del Consejo de Ministros y por el Ministro de Energía y Minas, 2006. [Online]. Available: https://cdn.www.gob.pe/uploads/document/file/95387/RM_036_2006_DM.pdf
[2] Rolando Ardiles Velasco, Boletín Estadístico de la Gerencia de Supervisión Minera, Accidentes Mortales Mediana Minería y Gran Minería, 2019.[Online]. Available: https://cdn.www.gob.pe/uploads/document/file/2016726/Boletin%20Osinergmin%20I%20Trimestre%202021.pdf.pdf
[3] Víctimas mortales 2017 según, Fax Coyuntural de Accidentes Mortales del Ministerio de Energías y Minas, 2017.  [Online]. Available: https://repositorio.unsa.edu.pe/server/api/core/bitstreams/df0adad8-dcd6-4a41-9e6e-450a084d6206/content 
[4] Miguel Angel Rodríguez Pozueta, “Circuitos de Corriente Alterna Trifásica,” Tesis, Universidad de Cantabria, 2021.
[Google Scholar] [Publisher Link]
[5] Soluciones de Seguridad Eléctrica en Minería Rc48c, Bender, Missisauga, ON. [Online]. Available:  https://www.benderinc.com/fileadmin/user_upload/NAE1111462_brochure_mining.pdf 
[6] GCHK-100 Mining Relay Ground Fault Protection System, C-407EM Instruction Manual, 2015. [Online]. Available: https://i-gard.com/site/assets/files/1155/c-407em_gchk-100.pdf
[7] Catalog No. S95-C135-00000, SE-135, SE Starco Engineering LTD, Saskatoon, SK.
[8] SE-107 Series-Ground-Fault Ground-Check Monitor, Littelfuse, 2022. [Online]. Available: https://www.littelfuse.com/products/protection-relays-and-controls/protection-relays/trailing-cable-protection/se-107.aspx
[9] Emerson Camasca Millán, “Influencia del Tablero Eléctrico ‘Grounding Check’ en la Protección del Equipo de Bombeo en la Minera Alpamarca Volcan, 2022,” Tesis, Para Optar el Título Profesional de Ingeniero Electricista, Universidad Continental, Huancayo, Perú, 2022.
[Google Scholar] [Publisher Link]
[10] INEI, Avance Coyuntural de la Actividad Económica, 2022. [Online]. Available: https://m.inei.gob.pe/biblioteca-virtual/boletines/avance-coyuntural/1/#lista
[11] Bregante Checa Giussepe Martin et al., “Protecciones En Lineas Electricas,” pp. 1-4.
[Google Scholar]
[12] Arévalo Moreno, and Fredy Wilson, “Guía Metodológica Para Pruebas De Relés De Protección Multifuncional Con El Equipo De Inyección Omicron CMC,” Tesis, Universidad Distrital Francisco Jose DE Caldas, 2015.
[Google Scholar] [Publisher Link]
[13] Javier Delgadillo, and Evelin Mirela, “Pruebas Rele de Protección Modelo PCS 985aw Con Maleta de Pruebas CMC356 en CH Huanza G1 Realizado por la Empresa Tabraj y Asociados,” Tesis, Universidad Nacional del Centro Del Peru, 2018.
[Google Scholar] [Publisher Link]
[14] Paulson G.E. et al., “Patente de EE.UU. N° 6.304.089, Washington,” DC: Oficina de Marcas y Patentes de los Estados Unidos.2001
[Google Scholar] [Publisher Link]
[15] Cofre J. y Seux T., “Solicitud de Patente de E.E.U.U. Nº 12/943.111,” 2012.
[Google Scholar] [Publisher Link]
[16] Vangool M., El-Kharbawe, and NES y Fenty G.J., “Patente de EE.UU. N° 9.989.576, Washington,” DC: Oficina de Marcas y Patentes de los Estados Unidos, 2018.
[Google Scholar] [Publisher Link]
[17] Magaly Mancha Mulato, “Influencia de EPP en el Control de Riesgos Laborales en la Unidad Minera Uchucchacua de la Compañía de Minas Buenaventura SAA,” Tesis, Universidad Nacional del Centro Del Peru, 2021.
[Google Scholar] [Publisher Link]
[18] Pérez García et al., “Nuevo Sistema de Gestión de Equipos de Protección Personal (EPP),” Tesis, Universidad Autónoma del Perú, 2022.
[Google Scholar] [Publisher Link]
[19] Calvo Coronel, and Jhony Yovano, “Sistema de Gestión de Seguridad y Salud Ocupacional Para la Prevención de Riesgos en la Industria Metalmecánica de la Compañía Minera Shougang Hierro Perú SAA-año 2014,” Tesis, Universidad Nacional Satiago Antunez de Mayolo, 2017.
[Google Scholar]
[20] Ospina Giraldo et al., “Diseño de un Sistema de Pruebas de Agua Para la Verificación de Grados de Protección en Gabinetes Electrícos Según la Norma Nema Para Tipo 3R y Tipo 4 Con Recuperación de Agua,” Tesis, Universidad Distrital Francisco Jose DE Caldas, Sistema de Biblotecas, 2016.[Google Scholar] [Publisher Link]