Comparative Assessment of Formwork Systems used in Construction Projects in the Tamale Metropolis of Northern Ghana

International Journal of Civil Engineering
© 2022 by SSRG - IJCE Journal
Volume 9 Issue 2
Year of Publication : 2022
Authors : Debrah Kwame Donkor, Shaibu Mahamud
pdf
How to Cite?

Debrah Kwame Donkor, Shaibu Mahamud, "Comparative Assessment of Formwork Systems used in Construction Projects in the Tamale Metropolis of Northern Ghana," SSRG International Journal of Civil Engineering, vol. 9,  no. 2, pp. 44-50, 2022. Crossref, https://doi.org/10.14445/23488352/IJCE-V9I2P104

Abstract:

Construction is one of the major continuous activities of man in every society. The need for infrastructure in our communities keeps increasing. As such, both the state and private individuals have different levels of demand for infrastructure. As a result of this, the sector requires different levels of input in order to achieve its desired goals. One key component of the construction sector is formwork which seeks to provide grounds for creating molds on structures. This study examined the major types of formwork used among contractors in the Tamale Metropolis of Ghana. Simple Random Sampling (SRS) was employed to select eighty (80) respondents from the construction industry in the metropolis. Data were expressed in terms of frequencies for purposes of analyses. It was found that contractors in the metropolis use both timber and steel formwork. However, both timber and steel formwork are challenged differently. These challenges ranged from poor containment, issues of leakages and accuracy challenges, as well as the cost of acquisition. As such, the respondents’ preference for the timber formwork was quite high, mainly due to the cost of acquiring the steel formwork even though it is seen to be more appropriate. In sum, the awareness of the appropriateness of steel formwork is high among respondents, but its usage is hindered by the cost of acquisition. The industry players should endeavour to make steel formwork accessible so as to ensure excellence in the construction industry of the Tamale Metropolis.

Keywords:

Construction, Formwork, Scaffold,Tamale, Project.

References:

[1] Nuzul Azam Haron et al, “Building Cost Comparison Between Conventional and Formwork System: A Case Study of Four Storey School Buildings in Malaysia,” American Journal of Applied Sciences, vol. 2, no. 4, pp. 819-823, 2005.
[2] M. RameshKannan, and M. Helen Santhi, “Constructability Assessment of Climbing Formwork Systems Using Building Information Modelling,” Procedia Engineering, vol. 64, pp. 1129-1138, 2013. Crossref, https://doi.org/10.1016/j.proeng.2013.09.191
[3] Robert G.Beale, “Scaffold Research—A Review,” Journal of Constructional Steel Research, vol. 98, pp. 188-200, 2014. Crossref, https://doi.org/10.1016/j.jcsr.2014.01.016
[4] Chien-Ho Ko Jiun-De Kuo, “Making Formwork Construction Lean,” Journal of Civil Engineering and Management, vol. 21, no. 4, pp. 444-458, 2015. Crossref, http://dx.doi.org/10.3846/13923730.2014.890655 
[5] M. Ramesh Kannan and Helen Santhi, “Constructability Assessment of Climbing Formwork Systems Using Building Information Modelling,” Procedia Engineering, vol. 64, pp. 1129-1138, 2013. Crossref, https://doi.org/10.1016/j.proeng.2013.09.191
[6] P. Duah, “An Appraisal of the Ghana Highway Authority Road Design Guide,” A Thesis Submitted To the Department of Civil Engineering, Kwame Nkrumah University of Science and Technology, Kumasi: KNUST, 2016.
[7] Opeoluwa Akinradewo et al., “The Ghanaian Construction Industry and Road Infrastructure Development: A Review,” In 14th International Postgraduate Research Conference-Contemporary and Future Direction on the Built Environment, Saltford, Manchester, 2019.
[8] Matilda Owusu-Bio et al., “The State of Road Transport Infrastructure and Ensuring Passenger Safety in Ghana,” European Journal of Logistics, Purchasing and Supply Chain Management, vol. 4, no. 2, pp. 79–85, 2016.
[9] I. A. Rubaratuka, “Influence of Formwork Materials on the Surface Quality of Reinforced Concrete Structures,” International Journal of Engineering and Applied Science, University of Dar ES Salaam, Tanzania, vol. 4, 2013.
[10] Naser Kabashi et al., “Formwork for Modern and Visual Concrete Construction,” 2017.
[11] Izatul lailiJabar et al., “Construction Manager's Competency in Managing the Construction Process of IBS Projects,” Procedia-Social and Behavioral Sciences, vol. 105, pp. 85-93, 2013. Crossref, https://doi.org/10.1016/j.sbspro.2013.11.010
[12] S. S.Asadi, and P. V Praneeth, “A Comparative Study for Evaluation of Different Form Work Systems Utilization in Construction Projects,” International Journal of Mechanical Engineering and Technology, vol. 8, no. 11, pp. 21-29, 2017.
[13] Swapnali M. Karke and M.B. Kumathekar, “Comparison of the Use of Traditional and Modern Formwork Systems,” Civil Engineering Systems and Sustainable Innovations, pp. 348-51, 2014.
[14] Emadaldin Mohammadi Golafshani and SiamakTalatahari , “Predicting the Climbing Rate of Slip Formwork Systems Using Linear Biogeography-Based Programming,” Applied Soft Computing, vol. 70, pp. 263-278, 2018. Crossref, https://doi.org/10.1016/j.asoc.2018.05.036
[15] Yuosre F. Badir; M. R. Abdul Kadir; and Ahmed H. Hashim, “Industrialized Building Systems Construction in Malaysia,” Journal of Architectural Engineering, vol. 8, no. 1, pp. 19-23, 2008. Crossref, https://doi.org/10.1061/(ASCE)1076-0431(2002)8:1(19)
[16] C. S. Poon, C. P. Robin, and C. O. YIP, “Comparison of Conventional and Low Waste Formwork in Hong Kong,” In Sustainable Building Conference, Tokyo, vol. 27, no. 19, pp. 42-48, 2005.
[17] Ketan Shah, “Modular Formwork for Faster, Economical and Quality Construction,” Indian Concrete Journal, vol. 79, pp. 6-23, 2005.
[18] O. G. Peurifoy, Formwork for Concrete Structures, 4th Ed., New York: Mcgraw-Hill Inc, 2011.
[19] Jørgen Burchardt, “Transportation Infrastructure Development in a Low - Income Country (GHANA),” 12th, in International Conference on the History of Transport, Traffic and Mobility (T2M), pp. 1–34, 2014.
[20] Hakim S Abdelgader, M. West, and JarosÅ‚aw Górski, “State-of-the-Art Report on Fabric Formwork,” In Proceedings of the International Conference on Construction and Building Technology, Kuala Lumpur, Malaysia, 2008.
[21] Emad Elbeltagi, et al., “Selection of Slab Formwork System Using Fuzzy Logic,” Construction Management and Economics, vol. 29, no. 7, pp. 659-670, 2011. Crossref, https://doi.org/10.1080/01446193.2011.590144
[22] M. Ashok, “Scaffolding & Formwork,” Maintenance & Safety CE &CR, vol. 11, pp. 46-50, 2006.
[23] Isaac Mensah, Theophilus Adjei-Kumi, and Gabriel Nani, “Duration Determination for Rural Roads Using the Principal Component Analysis and Artificial Neural Network, Engineering,” Engineering Construction and Architectural Management, vol. 23, no. 5, pp. 638–656, 2016. Crossref, http://dx.doi.org/10.1108/ECAM-09-2015-0148
[24] Pawar, Sandip et al, “Comparative Analysis of Formwork in a Multistory Building,” International Journal of Research in Engineering and Technology, vol. 3, no. 9, pp. 22-24, 2014.
[25] Gregory Charles Quinn and Christoph Gengnagel, “A Review of Elastic Grid Shells, Their Erection Methods and the Potential Use of Pneumatic Formwork,” Mobile and Rapidly Assembled Structures, vol. 4, pp. 136-129, 2014. Crossref, http://dx.doi.org/10.2495/MAR140111
[26] “District Analytical Report of Tamale Metropolis, Ghana Statistical Service; Housing and Population Census, GSS, Ghana Statistical Service (GSS). ACCRA, 2010.